top of page
Search

13

Updated: Dec 5, 2020

09 / 18 / 2020

Below our containers, we will have two sealed crawl spaces that require the walls to be insulated. Standard concrete wall construction requires wood form and rebar mats to be erected, concrete to be poured, forms to be stripped, and then insulation to be installed.

By using Insulated Concrete Forms (ICFs), we are providing insulation and form-work in one step. Boom. ICFs are essentially construction-grade Legos that snap into each other and are erected in a matter of days versus weeks.


Comments


bottom of page