Updated: Dec 5, 2020

07 / 14 / 2020

Begin construction! The first step was to install our stormwater management system, one of the perks of living in a steep zone. We need to collect all downspouts and area drains to run the water 180' down to the bottom of the ravine to prevent erosion.

After stormwater, the foundation was staked and we established finished floor elevation, and then began excavating.